img_2891

Advertisements

Boots on the ground

“The use of travelling is to regulate imagination by reality, and instead of thinking how things may be, to see them as they are.” – Samuel Johnson.

img_2833

Looking east along the Campbellford Sub. right-of-way at Madoc Jct.,  yesterday.

Every Autumn, I visit some part of the Campbellford Sub. between Lindsay and Belleville.  Even though the tracks between Peterborough and a couple of miles north of Belleville were removed in 1988, the right-of-of-way remains almost intact between the two cities, with a small break at Campbellford.   The portion between Anson Jct. and about a mile east of Lindsay is is now part of The Great Trail–formerly the TransCanada Trail.

https://thegreattrail.ca/explore-the-map/

I find this a good way to both recharge my interest in modelling the line and to photograph what’s left.  While also enjoying a walk in the time of year that I want to model.  With the passage of almost three decades, almost all railway structures are gone.  But most of the line’s bridges remain, used now by users of The Great Trail, snowmobilers, and ATV users.

img_2866

This beam bridge just east of where the diamond was at Anson Jct. spans a small creek.  I was able to get detail images showing the construction of the steel beams and trestle bents that hold them up. I have obtained CN Bridge and Building department info for basic measurements of this bridge, but it’s easy to get them directly off the structure while this “up close and personal”.

I wear fully-laced-up workboots, jeans, and a denim or cotton duck work jacket while walking the right-of-way.  In rural areas only, I carry bear spray in a belt holster as there have been bear sightings in the area, and the Ontario Ministry of Natural Resources states that most bear attacks happen to people walking alone in rural or wilderness areas.  A pair of work gloves completes my complement of essential items for a stroll down the line.  Those work gloves allow climbing around bridges and the like without getting your hands dirty. It’s also safer to feel free to grab any safely fixed item if necessary to stop or prevent a fall, even if its surface looks a little messy.

Safety glasses are a good item to use too–it’s no fun getting poked in the eye by a tree branch that you didn’t see.

A letter-size note pad, tape measure, and lots of sharp pencils allow me to take notes and record measurements of structures that I encounter.  Pencils don’t freeze in cold weather.

Until about a decade ago, I used a 35mm film SLR, but today’s digital cameras are so good now.  And pixels cost next to nothing compared to film.  I use a pocket digital with 20MB resolution that cost me about $200 and has many more features than that SLR did.  Bring a spare memory card if you feel it necessary, and be sure that you keep the camera battery charged.

dscn2197

What size are the ties?   This image was taken as the track was waiting to be pulled up by the scrappers.

Exploring the line between Lindsay and Belleville every year, I’ve been able to amass a lot of images and info to help me model the line.

And it all starts with your boots on the ground.

DSCN3331

Steel through girder bridge over the Indian River at Keene.  It’s been decked over for snowmobiles and ATV’s.

 

 

 

 

“Some night and weekend work…”

 

I’ve been a railway modeller since 1972, and a railway employee since 1987.  I currently work as a locomotive engineer on the spare-board.

What does this have to do with my modelling the Midland Railway?

A standing joke amongst railway running trades employees is that the job involves “some night and weekend work.”  More like just about every weekend and a LOT of night work.

That “night and weekend work” has paid my bills for almost thirty years.  And a few luxuries as well.

AND it’s taught me a lot about railroading that I would otherwise not be privileged to know.  Everything from hand signals to running a locomotive–while being paid to learn.

dscn2143

What is the purpose of this box alongside the track?  Just one thing that I’ve learnt over the years on the railway.  And I was able to measure up one of these and another larger signal relay box, HO versions of which are now offered by GLX Scale Models–but that’s another story.  Even the concrete post that the box is attached to is a standard design used all over the system–I’ve taken measurements and photos as well for future use.

I’ve been very fortunate to do this for a living.  Much of what I have learnt I want to apply both to my modelling and eventually to layout operation. And there is still much to learn.

 

Now, back to work!